Ivoclar Vivadent IPS e.max CAD Chairside v.1 Benutzerhandbuch

Seite 74

Advertising
background image

22

Place the restoration in the center of the IPS e.max CAD Crystallization Tray and fire using the

stipulated parameters.

Press the onlay slightly into the IPS Object Fix Flow material.

Place the onlay on the Crystallization Pin using diamond-coated tweezers.

Apply IPS Object Fix Flow on the IPS e.max CAD Crystallization Pin.

2

nd

step : Crystallization/Glaze firing

After glazing and staining, the Combination firing (crystallization/glaze) is conducted in a compatible ceramic furnace (e.g.

Programat CS). When placing the objects into the furnace and setting the firing parameters, please observe the following

points:

– An IPS e.max CAD Crystallization Tray and the corresponding pins must be used for the combination firing. Do not use a

honey-combed tray!

– Place the Crystallization Pin into the center of the IPS e.max CAD Crystallization Tray.

– Apply some IPS Object Fix Flow or Putty to the pin.

– Place the restoration on the Crystallization Pin using diamond-coated tweezers.

– A maximum of 6 restorations can be positioned on the firing tray and crystallized using the Combination firing with IPS

e.max CAD Crystall./Glaze Paste.

– If glaze paste is used, Speed Crystallization/Glaze Spray must not be used.

Immediately reseal the IPS Object Fix Putty/Flow syringe after extruding the material. Once removed from the

aluminium bag, the syringe is ideally stored in a re-sealable plastic bag or a container with a humid

atmosphere.

Conduct the combination firing (crystallization/glaze) in a ceramic furnace (e.g. Programat CS) using the following

parameters:

Crystallization/Glaze

Furnace

Programat

CS

Program 1

Stand-by

temperature

B

[°C/°F]

403/757

Closing time

S

[min]

6:00

Heating rate

t

1

[°C/°F/min]

90/162

Firing

temperature

T

1

[°C/°F]

820/1508

Holding time

H

1

[min]

0:10

Heating rate

t

2

[°C/°F/min]

30/54

Firing

temperature

T

2

[°C/°F]

840/1544

Holding time

H

2

[min]

7:00

Vacuum 1

1

1

[°C/°F]

1

2

[°C/°F]

550/820

1022/1508

Vacuum 2

2

1

[°C/°F]

2

2

[°C/°F]

820/840

1508/1544

Long-term

cooling

L

[°C/°F]

700/1292

Cooling rate

t

l

[°C/°F/min]

0

Please note:

– If glaze paste is used, Speed Crystallization/Glaze Spray must not be used.

– These firing parameters Crystallization/Glaze are not suitable for the crystallization of IPS e.max CAD MO!

Notes on cooling:

– Remove IPS e.max CAD objects from the furnace after completion of the firing cycle (wait for the acoustic signal of the furnace).

– Allow the objects to cool to room temperature in a place protected from draft.

– Do not touch the hot objects with metal tongs.

– Do not blast or quench the objects.

Advertising