Metrohm tiamo 1.2 Manual Benutzerhandbuch

Seite 152

Advertising
background image

126

Workplace

6 - Main run

When processing the loaded method the following actions can be carried out:

• Process series start track

At the start of the first determination in a series the Series start track is
started. If during the run of this track

[Stop]

is pressed then the Exit track

will start; if an error occurs the Error track starts.

• Process main track

After the start of the Main track the status changes to

BUSY

. The commands

of the main track and the other tracks that it calls up are processed in se-
quence. If the main track calls up tracks that are not free then a pause will
be made until these tracks can be started.

• Interrupt and continue run

A running determination can be interrupted at any time with

[Hold]

and then

continued with

[Cont]

. All the active tracks will be stopped and continued

together.

• Interrupt and continue series

A running series can be interrupted at any time with

[Pause]

. The determina-

tion that is running in the series will be completed, but no new determina-

tion will be started. With

[Cont]

the next determination in the interrupted

sample series will be started.

• Cancel sequence

A running determination can be canceled at any time with

[Stop]

. An Exit

track may be carried out; the determination will be terminated.

• Cancel by error

If when a determination is being carried out an error occurs that causes the
cancellation of the determination then an Error track may be carried out; the
determination will be terminated.

• Process exit track

When the main track and all the other tracks that is has called up have

been completed then an Exit track may be carried out; the determination
will be terminated.

• Process series end track

At the end of the last determination in a series the Series end track will start.
If when this track is being processed

[Stop]

is pressed then the determina-

tion will be terminated, if an error occurs then the Error track starts.

7 - Post-conditioning (only for methods with conditioning)

In methods that contain commands with switched-on conditioning and in which
the option

Automatic conditioning

is switched on in the

START

command then for all

these commands post-conditioning will be started automatically with the loaded

method immediately after the end of the track that contains the conditioning
command. After the start of post-conditioning the status changes to

COND BUSY

.

In this status the conditioning can be stopped with

[Stop]

or interrupted with

[Hold]

and continued with

[Cont]

. If an error occurs during conditioning then neither the

Error track nor the Exit track will be carried out.

• Conditioning between two determinations

Conditioning will continue to run until the new method is loaded for the next
determination.

• Conditioning at the end of the last determination

After the Series end track has been carried out conditioning will continue to
take place until it is terminated with

[Stop]

.

Advertising