9 make current previous method version – Metrohm tiamo 1.2 Manual Benutzerhandbuch

Seite 817

Advertising
background image

Methods

791

5.

Click on menu item

Sign, Signature 1...

.

The window

Signature Level 1

opens. If the selected method can be signed,

Signa-

ture possible

is displayed in the field

Info

.

6.

Enter or select

User

,

Password

,

Reason

, and

Comment

and click on

[Sign]

.

The selected method will be signed on level 1.

Note

Methods can be signed several times at level 1. They can be edited and dele-
ted. If the method is edited and saved again, a new version is created and all the
signatures will be deleted i.e. the method must be signed again.

Signature 2

Note
Methods can only be signed at level 2 if the user belongs to a user group with
the corresponding authorization.

5.

Click on menu item

Sign, Signature 2...

.

The window

Signature Level 2

opens. If the selected method can be signed,

Signa-

ture possible

is displayed in the field

Info

.

6.

Enter or select

User

,

Password

,

Reason

, and

Comment

and click on

[Sign]

.

The selected method will be signed on level 2.

Note
Methods signed at level 2 are

locked i.e. they can neither be edited nor deleted.

In order to make those methods modifiable again, all signatures at level 2 must
be deleted

7.6.9

Make current previous method version

1.

Select program part Method.

2.

Click on symbol

or menu item

File, Method manager...

.

The window

Method manager

opens.

3. Select

desired

Method group

.

4.

Select desired method.

5. Click

on

[History]

.

The window

Method history

showing all versions of the selected method opens.

6.

Select desired method that should be made current.

7. Click

on

[Make current]

.

The selected method version is set as the current method version. This creates a
new method whose version number is increased by

+1

compared with the last

version to have been saved.

Advertising